Key investment focus areas Investment Area Investment Focus and Opportunities Battery-Electric Propulsion Systems Investment in high-capacity lithium-ion batteries, battery management systems, regenerative braking and fast-charging technologies to extend operating range and improve energy efficiency. Hydrogen Fuel-Cell Technology Capital allocation towards hydrogen fuel-cell stacks, onboard hydrogen storage systems and fuel-cell-battery integration for passenger and freight trains operating on non-electrified routes. Hybrid Locomotive Modernization Investment in converting existing diesel locomotives into diesel-battery or dual-mode systems, allowing operators to reduce emissions without replacing entire fleets. Advanced Power Management Systems Funding for intelligent energy-management software, traction control and power-conversion systems to optimise energy distribution between diesel engines, batteries and electric traction. Hybrid Train Manufacturing Capacity Expansion of production facilities, component manufacturing capabilities and testing infrastructure to support increasing orders for battery-hybrid, hydrogen and tri-mode trains. Railway Charging and Hydrogen Infrastructure Investment in depot charging stations, grid connections, hydrogen refuelling facilities and maintenance infrastructure required for commercial hybrid train deployment. Some notable investment examples are listed below: NEXRAIL – Stadler EURO9000 Hybrid Locomotive Order (November 2025) Company NEXRAIL and Stadler Investment Order for up to 200 hybrid locomotives; total contract value not disclosed. Location Luxembourg and Valencia, Spain Project Procurement of Stadler's EURO9000 pantograph-battery hybrid locomotives for European freight operations. Technology Hybrid propulsion combining up to 9 MW of pantograph power with 1.2 MW of battery power. Investment Details NEXRAIL commissioned Stadler to manufacture up to 200 locomotives based on the EURO9000 platform. The battery system supports energy storage, regenerative braking and peak shaving. Expected Impact The locomotives are designed to enable zero-emission freight operations between terminals, while supporting cross-border railway transportation across multiple European countries. Project Timeline Announced on 12 November 2025; the order provides for delivery of up to 200 locomotives. Source: Company Website Siemens Mobility – Battery System Manufacturing Facility (September 2025) Company Siemens Mobility Investment Approximately €35 million (US$41 million) Location Luhe-Wildenau, Bavaria, Germany Project Establishment of a dedicated battery-system manufacturing facility for railway vehicles. Technology Modular battery systems and advanced battery management systems for regional trains and locomotives. Investment Details Siemens Mobility is investing approximately €22 million in the project, while the Bavarian government is providing €2.7 million in subsidies. The facility will manufacture battery systems for Siemens trains, locomotives and external customers. Expected Impact The facility is expected to create up to 200 jobs and achieve annual production capacity of up to 120 MWh of battery systems. Project Timeline Construction completion is scheduled for spring 2027, with series production expected to begin in October 2027. Source: Company Website Akiem – Siemens Vectron Dual Mode Locomotive Order (June 2025) Company Akiem and Siemens Mobility Investment Firm order for 10 locomotives, with an option for 40 additional units; contract value not disclosed. Location Germany and Austria Project Expansion of Akiem's locomotive fleet through the procurement of Vectron Dual Mode locomotives. Technology Dual-mode electric and diesel propulsion, allowing locomotives to operate on both electrified and non-electrified railway sections. Investment Details Akiem placed a firm order for 10 locomotives under its existing framework agreement with Siemens Mobility, with an option to purchase 40 additional units. Expected Impact The locomotives will provide operational flexibility across mixed railway infrastructure, reduce dependence on diesel-only traction and eliminate the need for locomotive changes between electrified and non-electrified routes. Project Timeline First deliveries were scheduled for the fourth quarter of 2026. Source: Company Press Release Arriva – £300 Million Battery-Hybrid Train Investment (April 2025) Company Arriva Group, Hitachi Rail and Angel Trains Investment Approximately £300 million (US$390 million) Location United Kingdom Project Replacement of Grand Central's existing fleet with nine new battery-hybrid trains comprising 45 rail cars. Technology Hitachi Rail's tri-mode propulsion technology, combining electric, battery and diesel power. Investment Details Arriva committed to the fleet procurement alongside a 10-year maintenance and leasing arrangement financed by Angel Trains. The trains will be manufactured at Hitachi Rail's Newton Aycliffe facility in North East England. Expected Impact The new fleet is expected to increase passenger seating capacity by 20%, provide approximately 400,000 additional seats annually and reduce emissions and fuel consumption by around 30%. Project Timeline Deliveries are scheduled for 2028. Source: Company Website Share this article